7 March 2012

BAGGAGE COMPARTMENT

With a #30 drill bit, pilot holes was enlarged through

the baggage back and baggage back channel (right)

The pilot holes was expanded with a #30 drill bit through

the baggage back and baggage back channel (left)

The baggage angle was taken out from the baggage back.

A straight line was drawn 9.5mm from edge. This line was for pilot holes

drilling guide from the top skin through the baggage angle.

The baggage back was installed to the fuselage and clecoed.

The top skin was carefully installed to the rear fuselage assembly.