28 March 2012

BAGGAGE COMPARTMENT

The #40 pilot holes was enlarged to #20 size holes through the left side skin

and top left longeron from the top left upright to forward.

Then, the #40 pilot holes was enlarged to #20 size holes through the skin,

shoulder harness attachment (75F3-8), flaperon control cover and top left longeron.

Finish drilling for previous operation.

The #40 pilot holes were then enlarged to #20 size holes through the right side skin

and top left longeron, from top right upright to forward.

Then, the pilot holes were enlarged to #20 size holes through the right side skin,

right shoulder harness attachment (75F3-8), right flaperon control cover

and top right longeron.