28 February 2014

FUSELAGE JOINING & FORWARD FUSELAGE SECTION

 

Today, we have continued to rivet the bottom fuselage, under the Heal Support, 75-F10-5. There will be 3 locations that is at the middle (as shown in the picture) and at both ends

 

As shown in the picture above, we have riveted both of the sides. These are the pictures for the Pilot Sides

 

And above are the pictures of the passenger Side that has been riveted

 

Then, we rivet the Pedal bearing Channel, 75-F10-7, to the Bottom Skin Fuselage with A3 rivet

 


Next we will install AN3-5A bolt, washer and SL nuts on the Brake Cylinder Support, 75-C3-8, and Lateral Pedal Bearing, 75-C3-7. With 23 in.lb value on the Torque Wrench, we then torque the nuts

 

As shown in the pictures above, we have applied white torque seal to the AN3-5A bolts

 


 

Next we continue to install bolt as shown above

Part

Hardware

Quantity

75C3-6 (Central pedal Bearing)

AN3-16A, Washer and SL Nuts

3 ea

 

Next we continue to install bolt as shown above and White Torque Seal applied

Part

Hardware

Quantity

75F12-5 (Lower Bearing Support)

AN3-5A, Washer and SL Nuts

4 ea