27 February 2014

RUDDER CONTROL

 

As for today we have start to continue on the assembly process of the Rudder Controls (75-CA-3). Below is the picture of the Rudder Controls. This will be riveted with AS5 rivets

 

As shown in the picture above, we have started to rivet the 75C3-9 and the 75C3-5

 

And as shown above, we are in progress to finish riveting the Rudder Controls

 

And as picture below, it is shown that the Rudder Control is finished riveted