2 March 2011
SLAT ASSEMBLY (CONTINUE)
The L angle was bent to match the bottom curvature of the Rib.
The CLAMP was used to hold the L angle and the Rib
The above process was repeated for 8 other Ribs
A set of Slat Support between the L angle and the Rib is ready for clecoing.