7 March 2011
SLAT ASSEMBLY (CONTINUE)
Before expanding the hole, the flange and the Slat Rib were clamped using CLAMP.
After drilling, the Slat Support was clecoed between the L angle and the Rib
The Ribs was clecoed to the bottom of the Skin. Then, the Skin was drilled into the L angles with #40 drill bit and clecoed.