4 April 2011
SLAT ASSEMBLY (CONTINUE)
The Slat was flipped over and positioned on the beams.
The Ribs were clecoed to the top of the Skin.The Ribs were evenly clecoed across the Span starting from the leading edge towards the trailing edge.
The Slat was flipped over and every other hole was clecoed for the aft rivet line on the Skin.