7 October 2011

7 OCTOBER 2011

 

 

The left O/B slat was ratchet strapped and the rib, spar, and rear slat was riveted

 

The O/B left slat was twisted under tolerances by 4mm . Then the O/B right slat was riveted and twisted under tolerances by 2mm.