17 February 2014
FLAPERON CONTROL
As for today, we have started to select bolts, washer and SL nuts, and pre installed those parts to the flaperon control as described below
This is the Vertical Flaperon Control Rod (75C1-10). The bottom of the Vertical Flaperon Control is then installed with CW____, AN5-11A bolt, Washer, SL Nuts and 75C2-2 (Control Rod Bushing)
Next the Top of the Vertical Flaperon Control Rod is installed with AN5-22A, Flaperon Control Spacer (75C2-10), 75C2-2 (Control Rod Bushing), Washer and SL Nut as shown in the picture
The Pilot Side Vertical Flaperon Control is then pre-installed to the Pilot Side Fuselage as shown in the picture. We also have pre installed the Vertical Flaperon Control for the Passenger Side
Next, we move on to install the Horizontal Flaperon Control Rod (75C2-1) as shown in the picture
Then we installed the required parts for the Horizontal Flaperon Control. AN5-11A bolt, 75C2-2 (Control Rod Bushing), Washer and SL Nut as shown in the picture
And as for the other side, we installed the required parts that is AN5-11A bolt, 75C2-2 (Control Rod Bushing), Washer and SL Nut as shown in the picture
And above is the picture for the completed Horizontal Flaperon Control, pre installed
- Hits: 5