Skip to main content

17 July 2014

FLAPERON CONTROL

 

Now, we will continue on the installation of the Torque Tube to the Forward Fuselage Assembly

 

And referring to the Photo Manual, This is the Front Torque Tube Bearing Rudder Fairlead (75C4-4) and Front Torque Tube Bearing (75C3-1)

 

The Failead is clamped inside the flanges of the bearing so the fairlead is flushed at the top. The Bearing is then back drill into the fairlead with a #40 drill bit and cleco

  • Hits: 11