19 March 2012
BAGGAGE COMPARTMENT
With a #30 drill bit, the pilot holes was enlarged from bottom side control tunnel to top control tunnel.
The side skin was drilled through baggage back with a #30 drill bit.
Baggage back and angle was debured.
With a #40 drill bit, L angle with length 100mm was drilled to the right
flaperon control cover and a 50mm L angle was also drilled to the right upright.
With a #40 drill bit, a 100mm L anglewas drilled to the
left flaperon control cover and 50mm L angle to the left upright.
The right side holes was enlarged to an A3 size.
The left side holes was enlarged to an A3 size.
The #40 size holes for the right lower baggage floor and right side skin was enlarged to a #30 size.
The #40 size holes for the left lower baggage floor and left skin was enlarged to a #30 size.
The flaperon control cover and left and right upright holes was drilled with a #30 drill bit.
Baggage compartment parts, flaperon control cover and both uprights was debur.