28 March 2012
BAGGAGE COMPARTMENT
The #40 pilot holes was enlarged to #20 size holes through the left side skin
and top left longeron from the top left upright to forward.
Then, the #40 pilot holes was enlarged to #20 size holes through the skin,
shoulder harness attachment (75F3-8), flaperon control cover and top left longeron.
Finish drilling for previous operation.
The #40 pilot holes were then enlarged to #20 size holes through the right side skin
and top left longeron, from top right upright to forward.
Then, the pilot holes were enlarged to #20 size holes through the right side skin,
right shoulder harness attachment (75F3-8), right flaperon control cover
and top right longeron.
- Hits: 200