23 July 2013
FUSELAGE JOINING & FORWARD FUSELAGE SECTION
As for today, we will start to assemble all the parts after the primer are well dry. So, for today, we will assemble the Rudder Pedal with all associated parts as picture below
As shown in the picture, the Toe Brake Pedal and the Piano Hinge are primered
As shown in the picture the Rudder Pedal are assembled
Then we move on to assemble the parts on the Rudder Controls
Next, we move on to assemble the Seat Channel and both L-angles on its sides
Next, we assembled the parts on the Gear Channel
As shown in the picture above, we also assembled the L-angle to both Seat Support
Next, we clecoed the Both Arm Rest Side and Inboard Seat Belt Attachment
As shown in the picture, we will start to do rivet on these holes
As picture above, it is shown we have riveted the Gear Channel Doubler (75F10-2) to the Gear Channel, 75F10-1 on both front and aft side
Next, we riveted the other sides of the Gear Channel Doubler
- Hits: 10