28 February 2014
FUSELAGE JOINING & FORWARD FUSELAGE SECTION
Today, we have continued to rivet the bottom fuselage, under the Heal Support, 75-F10-5. There will be 3 locations that is at the middle (as shown in the picture) and at both ends
As shown in the picture above, we have riveted both of the sides. These are the pictures for the Pilot Sides
And above are the pictures of the passenger Side that has been riveted
Then, we rivet the Pedal bearing Channel, 75-F10-7, to the Bottom Skin Fuselage with A3 rivet
Next we will install AN3-5A bolt, washer and SL nuts on the Brake Cylinder Support, 75-C3-8, and Lateral Pedal Bearing, 75-C3-7. With 23 in.lb value on the Torque Wrench, we then torque the nuts
As shown in the pictures above, we have applied white torque seal to the AN3-5A bolts
Next we continue to install bolt as shown above
Part |
Hardware |
Quantity |
75C3-6 (Central pedal Bearing) |
AN3-16A, Washer and SL Nuts |
3 ea |
Next we continue to install bolt as shown above and White Torque Seal applied
Part |
Hardware |
Quantity |
75F12-5 (Lower Bearing Support) |
AN3-5A, Washer and SL Nuts |
4 ea |
- Hits: 8