9 June 2014
FUSELAGE JOINING & FORWARD FUSELAGE SECTION
As for today, we have started to rivet using A6 Rivet to the 75F4-4 (Rear Wing Attachment), 75F4-1 (Side Channel) and 75F3-6 (Top Channel). As you can see in the photo, we have inserted the A6 Rivets while some of the holes are fastened by cleco. A pneumatic riveter was used to rivet the A6 riveter with a 70 psi
Riveting in progress
Finished riveting the Pilot Side of the Fuselage. We have checked all the head and tail of the rivets, and we detected no cracks happened after we have finished doing rivets
Next we continue to do riveting on the passenger side of the fuselage, A6 Rivet to the 75F4-4 (Rear Wing Attachment), 75F4-1 (Side Channel) and 75F3-6 (Top Channel) on the passenger side. 70 psi is used for the pneumatic riveter
We have finished riveting the passenger side of the fuselage, A6 Rivet to the 75F4-4 (Rear Wing Attachment), 75F4-1 (Side Channel) and 75F3-6 (Top Channel) on the passenger side
Both are riveted with the top fuselage is still not installed
- Hits: 8